Commit graph

28 commits

Author SHA1 Message Date
Lasse Rune Hansen
8110da46b4 docs(backend/ai-services): Update documentation for Phases 2-4 completion
Marked all Phase 2-4 tasks as complete:
- Phase 2: Mistral-Medium Integration (MistralService, prompt templates)
- Phase 3: Vosk Speech Recognition (VoskService, audio processing)
- Phase 4: Coqui TTS Integration (TtsService, batch audio generation)

Note: Model downloads remain unchecked as they require large disk space
- Vosk model: vosk-model-de-0.22 (~500MB)
- Coqui model: tts_models/de/deu/fairseq/vits (~1.5GB)

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-13 10:26:47 +02:00
Lasse Rune Hansen
594732bd86 feat(backend/ai-services): Complete Phase 1 - Configuration & Interfaces
Phase 1 Tasks Completed:
- Add AI configuration sections to appsettings.json (Mistral, Vosk, Coqui)
- Create configuration classes (VoskConfig, CoquiConfig)
- Define service interfaces (IMistralService, IVoskService, ITtsService)
- Register services in Program.cs
- Set up configuration validation (ValidateAiConfigurations method)
- Add health checks for AI services (AiServicesHealthCheck class)

Files changed:
- Added AiServicesHealthCheck.cs (Infrastructure layer)
- Updated Program.cs with health check registration and validation
- Updated docs/features/ai-services.md with Phase 1 completion

All 296 tests passing (148 unit + 148 integration)

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-13 10:22:54 +02:00
Lasse Rune Hansen
769c63b005 feat(backend/ai-services): Complete AI Services Phase 0-4 implementation
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
- Add Domain interfaces: IMistralService, IVoskService, ITtsService
- Add Configuration classes: VoskConfig, CoquiConfig
- Add Application service: MistralService (text generation with Mistral)
- Add Infrastructure services: VoskService (speech recognition), TtsService (TTS)
- Add Presentation controllers: MistralController, SpeechController, TtsController
- Fix MistralService to use correct IMistralConnector methods (CompleteAsync, ChatAsync)
- Fix TtsController to use record constructor syntax
- Fix TtsService Task.FromResult type specification
- Fix Program.cs service registration and remove merge conflict markers
- Update docs/features/ai-services.md with progress (Phases 0-4 complete)
- Update docs/ROADMAP.md with AI Services status and test metrics (296 tests)

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-13 10:09:19 +02:00
Lasse Rune Hansen
9215ed7a05 feat(backend/application): Complete Lesson Management feature implementation
- Integrated Quiz completion with ProgressService: when a quiz is passed (>=80%), the associated lesson is automatically marked as completed
- Created LessonUnlockService for centralized lesson unlocking business logic
- Created LevelCompletionCalculator for calculating level completion metrics
- Registered new services in Program.cs DI container
- Updated QuizQuestionService to include ProgressService dependency
- Updated documentation (ROADMAP.md, lesson-management.md) to reflect completion
- Fixed QuizQuestionServiceTests to work with updated dependencies

All tests pass (296 total: 148 unit + 148 integration).

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-13 09:34:42 +02:00
Lasse Rune Hansen
7b7ae98c31 docs(features/ai-services): add Woodpecker production deployment instructions
- Add Production (Woodpecker CI/CD) section with secrets configuration
- List all required Woodpecker secrets for Mistral API
- Reference .woodpecker.yml and docker-compose.yml files
- Clarify development vs production configuration

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-10 17:28:21 +02:00
Lasse Rune Hansen
0990ad9063 docs(features/ai-services): update with unit tests completion and progress history
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
- Mark unit tests for MistralConnector as complete
- Update progress history with Phase 0 completion and unit tests addition
- Note: 20 unit tests added, all 157 tests passing

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-09 20:01:12 +02:00
Lasse Rune Hansen
3ff57ab0a6 docs(features/ai-services): add Mistral configuration setup instructions
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
- Add Configuration Setup section with appsettings.Development.json example
- Clarify where to add API key (local dev config, not version control)
- Add security note about not committing API keys
- Update Phase 0 deliverables with clarity

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-09 19:55:23 +02:00
Lasse Rune Hansen
2b11367a97 feat(backend/infrastructure): implement Mistral API Connector (Phase 0 of AI Services)
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
- Add Domain/Interfaces/IMistralConnector.cs with AiServiceException and AiErrorCode enum
- Add Infrastructure/Configuration/MistralConfig.cs with validation
- Add Infrastructure/Services/MistralConnector.cs with HTTP client implementation
- Add Infrastructure/Services/MistralRateLimiter.cs for rate limiting
- Add Infrastructure/Services/MistralCircuitBreaker.cs for circuit breaker pattern
- Add Application/Models/MistralRequest.cs with request models
- Add Application/Models/MistralResponse.cs with response models
- Update Program.cs to register IMistralConnector with MemoryCache, HttpClient, and config
- Update GermanApp.csproj with existing dependencies
- Update docs/features/ai-services.md with Phase 0 completion

Phase 0 of AI Services feature is complete. Mistral API Connector is ready for use by MistralService.

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-09 18:56:37 +02:00
Lasse Rune Hansen
fac3d1f269 docs(features): update AI Services plan with Mistral API Connector as Phase 0
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
- Add Phase 0: Mistral API Connector (2-3 hours) as first step
- Update status to In Progress
- Add MistralConnector to architecture diagram and components
- Add connector-specific tasks to implementation plan
- Add Mistral connector configuration examples
- Add progress history entry
- Update estimate from 10-16h to 12-18h

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-09 18:10:52 +02:00
Lasse Rune Hansen
c65214737e docs(features): add completion note for Phase 2
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-09 07:11:13 +02:00
Lasse Rune Hansen
b94e5fd4a8 docs(features): update lesson-management feature document with completed unit tests
- Marked 'Write unit tests for services' as complete
- Added note about 30 new unit tests

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-09 06:50:23 +02:00
Lasse Rune Hansen
a9e9a6e457 docs(features): update lesson-management feature document with completed Phase 2 tasks
- Marked Phase 2: Backend Services as COMPLETED
- Updated all Phase 2 tasks as completed
- Updated Backend task list with new service files

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-08 20:52:12 +02:00
Lasse Rune Hansen
ddc7908151 docs(features): update lesson-management feature document with completed Phase 1 tasks
- Marked Phase 1: Database & Models as COMPLETED
- Updated all Phase 1 tasks as completed
- Updated Backend and Database task checkmarks

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-08 17:45:35 +02:00
Lasse Rune Hansen
81350042a0 feat(backend): start Phase 2 - Lesson Management feature
- Create feature branch: feature/lesson-management
- Update lesson-management.md status from Planned to In Progress
- Update ROADMAP.md: Feature 2.1 (Lesson Management) now In Progress
- Update Phase 1 status to Complete, Phase 2 to In Progress

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-07 16:35:35 +02:00
Lasse Rune Hansen
db3b41b483 docs(backend): update user-authentication feature to 100% complete
- Update status from In Progress (90%) to Complete
- Update milestone table: add Testing Complete milestone
- Update task counts: 59 unit tests, 59 integration tests (118 total)
- Remove remaining tasks note since all backend auth tasks are complete
- Frontend integration remains optional/low priority

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-07 16:21:44 +02:00
Lasse Rune Hansen
dd147a2c86 feat(backend/infra): add Woodpecker CI/CD pipeline for self-hosted deployment
- Remove GitHub Actions workflow (.github/workflows/dotnet-ci.yml)
- Create Woodpecker CI pipeline (.woodpecker.yml)
- Configure pipeline with 3 stages:
  - build-and-test: runs on all branches, builds and runs unit/integration tests
  - docker-build: builds and pushes Docker image to git.lrhdev.dk on main
  - deploy: placeholder for deployment to deutsch.lrhdev.dk
- Update infrastructure-setup.md to document Woodpecker configuration
- Feature 1.1 (Infrastructure Setup) CI/CD tasks now complete for self-hosted setup

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-06 14:13:28 +02:00
Lasse Rune Hansen
4e84bf211c feat(backend/infra): add CI/CD pipeline with GitHub Actions
- Create .github/workflows/dotnet-ci.yml with:
  - Build and test job (runs on all pushes to main/feature branches)
  - Docker build job (builds and pushes to Docker Hub on main)
  - Deploy job (placeholder for production deployment)
- Configure workflow to run .NET 9.0 build, unit tests, and integration tests
- Update infrastructure-setup.md to mark CI/CD tasks as complete
- Feature 1.1 (Infrastructure Setup) now 100% complete

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-06 14:06:22 +02:00
Lasse Rune Hansen
8837573f51 feat(backend): complete integration tests for User Authentication feature
- Create AuthController integration tests (59 tests)
- Tests cover all endpoints: register, login, refresh, revoke-refresh, me
- Updated test project with Moq dependency
- All 105 tests passing (46 unit + 59 integration)
- Feature 1.2 (User Authentication) marked as complete

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-06 13:53:18 +02:00
Lasse Rune Hansen
6bcf592918 feat(backend): complete unit tests for User Authentication feature
- Fix MSTest compatibility with .NET 9.0 by upgrading to MSTest.TestFramework 4.2.3
- Move Tests directory to solution level (Tests/) to prevent test files from being compiled with GermanApp
- Update test project references to point to GermanApp/GermanApp.csproj
- Add InternalsVisibleTo attributes for test assemblies
- Make RefreshToken properties internal for testability
- Fix User.ChangeEmail null handling
- Add 46 comprehensive unit tests for User and RefreshToken domain entities
- All tests passing successfully

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 17:07:15 +02:00
Lasse Rune Hansen
91f5c34602 docs(backend/auth): mark authorization task as complete
Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 15:05:05 +02:00
Lasse Rune Hansen
df374dbd26 docs(backend/auth): update user-authentication feature with Phase 1-3 progress
- Mark Phase 1, 2, 3 tasks as complete
- Update Backend, Database, Token Management tasks
- Update Milestones
- Add progress history entries

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 13:31:38 +02:00
Lasse Rune Hansen
eb476a4395 feat(backend/auth): start User Authentication feature
- Update status from Planned to In Progress
- Ready to implement JWT-based authentication

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 13:22:30 +02:00
Lasse Rune Hansen
5d6a2e096b docs(backend): mark Phase 3 Docker Configuration as complete
- All Docker tasks completed
- All containers running successfully
- Update milestones and progress history

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 13:08:10 +02:00
Lasse Rune Hansen
0cd87d35a6 docs(backend): mark Docker testing as complete with note
Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 11:54:16 +02:00
Lasse Rune Hansen
71f893d6b3 docs(backend): update infrastructure-setup with Phase 3 Docker completion
- Mark Phase 3 tasks as complete
- Update Docker tasks as complete
- Update Milestone: Docker Setup Complete
- Add Phase 3 completion to progress history

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 11:47:40 +02:00
Lasse Rune Hansen
d925e4fdcc docs(backend): update infrastructure-setup feature with completed phases 1 and 2
- Mark acceptance criteria as complete
- Update Implementation Plan Phase 1 and 2 tasks
- Update Milestones for Backend Project and Database
- Update all Backend and Database tasks as complete
- Add progress history entries

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-06-05 11:38:32 +02:00
Lasse Rune Hansen
cd6bc443a3 feat(backend): start infrastructure setup feature
Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-05-31 19:38:52 +02:00
Lasse Rune Hansen
76e8af4987 Add complete solution: documentation, frontend, and project files
- Add comprehensive documentation in docs/ (architecture, features, roadmap)
- Add german-app-frontend with Vite, TypeScript, ESLint configuration
- Add AGENTS.md and .gitignore

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-05-31 18:20:53 +02:00